Objective: Managing the school’s HVAC system, making the right compromise between indoor air quality and outdoor air quality.
Installation de 4 capteurs dans l’enceinte de l’établissement :
– 2 capteurs de CO2 – COV légers
– 2 capteurs de CO2 – PM – COV totaux
The piloting of the CMS is controlled by CO2 and fine particulate concentration limit values
Energy savings of 13% linked to a 37% decrease in AHU load thanks to predictive regulation.
Predictive control of heating according to occupancy, external disturbances (weather) and the building’s thermal inertia.
In this way, we limit situations of over-consumption and discomfort.
energy savings
reduction in CO2
Maintaining indoor air quality
Compliance with regulatory thresholds for optimal health and comfort
A turnkey solution
100% implementation by Octopus Lab of building-wide control via the BMS connection
Optimization of equipment
Reduction and optimization of the operation of HVAC systems (planning and engine intensity)
Contact us to receive the full case study and discuss it with our experts
Bonjour ! C'est nous, les cookies 🍪
Nous sommes chargés de compter le nombre de visites sur ce site internet. Nous aidons énormément les personnes qui travaillent ici, car nous leur permettons d'améliorer le contenu du site internet mais aussi de rendre votre visite plus agréable.